Building Update – 11 September 2021
The plumber has completed the pre-plumbing. The 2 outside taps now have water, Yeah! The preliminary plumbing for the heat pump hot water has been done, ready for when the hot water system arrive, much later in the build to prevent it from walking away. The drainage pump has also been connected ready for plumbing…